| |  |
Emergency repairs |
| | 
 |
Long & short term general plant maintenance |
| |  |
Shift / vacation coverage |
| |  |
Project cost analysis |
| |  |
Performance and quality reviews |
| | 
 |
Liaison with vendors and suppliers |
| | 
 |
Complete design of mechanical equipment |
| | 
 |
Provision of detailed drawings and workshop drawings for both existing and new equipment |
| |
 |
Design and build custom machinery |
 |
| |
 |
Full engineering capability |
| |
 |
Carbon steel & alloy welding |
| |

 |
Platforms / catwalks / handrails / ladders / stairs / tanks |
| | 
 |
Threaded / welded / victolic / morris coupling |
| | 
 |
PVC / stainless / carbon steel / aluminum / copper |
| |  |
Piping upgrades |
| |  |
Complete plant installations |
| |  |
Additions / modifications |
| | 
 |
Conveyor belt installations, repairs, troubleshooting, general mechanical |
| |  |
Chute lining, impact area |
| |  |
Belt cleaning systems |
| | 
 |
Screw / pneumatic / bucket elevator & belt conveying systems |
| |  |
Routine |
| | 
 |
Prevention / Predictive / Condition based |
| |  |
Unplanned / Planned Turnaround |
| |  |
Revamp projects |
| | 
 |
Create a complete PM system to suit your needs |
| | 
 |
Evaluate and advise on existing PM program |